search for books and compare prices
cover image
The Army Did Not Properly Account for and Manage Force Provider Equipment in Afghanistan
Price
Store
Arrives
Preparing
Shipping

Jump quickly to results on these stores:

The price is the lowest for any condition, which may be new or used; other conditions may also be available.
Jump down to see edition details for: Paperback
Bibliographic Detail
Publisher Createspace Independent Pub
Publication date December 6, 2014
Pages 48
Binding Paperback
Book category Adult Non-Fiction
ISBN-13 9781505396669
ISBN-10 1505396662
Dimensions 0.11 by 8.50 by 11 in.
Original list price $14.95
Summaries and Reviews
Amazon.com description: Product Description: Our audit objective was to determine whether DoD properly accounted for Force Provider (FP) equipment in Afghanistan. See Appendix A for the Scope and Methodology and Appendix B for a list of prior audit coverage. FP equipment is the Army’s premier life support base camp system that is a containerized and highly deployable “tent city.” The FP concept began in 1991 as a result of inadequate living conditions for soldiers during Operations Desert Shield and Storm. FP modules consist of military and commercial equipment, which includes climate-controlled billeting, food preparation and dining facilities, hygiene services, and morale, welfare and recreation facilities. FP modules accommodate up to 600 personnel and can also be divided into four, 150-man expeditionary base camps. FP can be issued as a complete module or as individual expeditionary base camps. A single FP module is packaged in approximately 103 triple containers, five 20-foot containers, 27 trailer-mounted generators, and assorted other self-storing items. This facilitates transportation by any combination of air, rail, land, and sea. See Figure 1 below for examples of FP module setup in Afghanistan. FP is part of Army Prepositioned Stocks (APS) and is recorded as Theater Provided Equipment (TPE) when deployed. The Army produced five different versions of FP modules: A, B, C, D, and E. The Army only deployed versions B, C, and D to Afghanistan and is only retrograding items from versions C and D that TACOM Life Cycle Management Command (TACOM) identified as required for reset.

Editions
Paperback
Book cover for 9781505396669
 
The price comparison is for this edition
from Createspace Independent Pub (December 6, 2014)
9781505396669 | details & prices | 48 pages | 8.50 × 11.00 × 0.11 in. | List price $14.95
About: Our audit objective was to determine whether DoD properly accounted for Force Provider (FP) equipment in Afghanistan.

Pricing is shown for items sent to or within the U.S., excluding shipping and tax. Please consult the store to determine exact fees. No warranties are made express or implied about the accuracy, timeliness, merit, or value of the information provided. Information subject to change without notice. isbn.nu is not a bookseller, just an information source.