search for books and compare prices
Tables of Contents for Apollo 7
Chapter/Section Title
Page #
Page Count
Apollo 7 Press Kit Index
First Manned Apollo
10
1
Mission Objectives
11
1
Mission Description
12
6
Flight Plan
18
1
Alternate Missions
19
3
Experiments
22
1
Abort Modes
22
1
Spacecraft Structure Systems
23
7
The Saturn IB Launch Vehicle
30
2
Flight Sequence
32
1
Launch Preparations
33
2
Launch Complex 34
35
2
Mission Control Center Houston
37
1
Manned Space Flight Network
38
4
Photographic Equipment
42
8
Crew Biographies
50
3
Apollo 7 Test Program
53
3
Apollo Contractors
56
1
Apollo Program Officials
57
58
Pre Launch Mission Operation Report
General
61
3
Program Development
61
1
The Apollo 7 Mission
62
2
NASA Mission Objectives for Apollo 7
64
1
Primary Objectives
64
2
Detailed Test Objectives
64
1
Launch Vehicle
64
1
Spacecraft
64
2
Secondary Objectives
66
1
Launch Vehicle
66
1
Spacecraft
66
1
Safety Planning
66
1
General
66
1
Pre-Launch Procedures
67
1
Range Safety
67
1
Launch Countdown and Turnaround Capability AS-205
67
1
Scrub Turnaround
67
1
Turnaround Conditions vs Time
67
1
Post LV Cryo Load (SC Cryo Reservicing)
67
1
Post LV Cryo Load (No SC Cryo Reservicing)
67
1
Pre LV Cryo Load (SC Cryo Reservicing)
68
1
Pre LV Cryo Load (No SC Reservicing)
68
1
Detailed Flight Mission Description
68
1
Nominal Mission
68
3
Pre-Launch
68
1
Launch and Parking Orbit
68
1
S-IVB/CSM Separation
69
1
CSM/S-IVB Rendezvous
69
1
Terminal Phase Initiation
70
1
CSM Operations
70
1
De-Orbit Maneuver
71
1
Re-Entry and Landing
71
1
Contingency Operations
71
6
Aborts
72
4
Alternate Missions
76
1
Space Vehicle Description
77
1
Launch Vehicle Description
78
2
First Stage (S-IB)
78
1
Second Stage (S-IVB)
78
1
Instrument Unit (IU)
79
1
Spacecraft Description
80
1
Safety Considerations
80
1
Launch Escape Assembly
80
1
Command Module (CM)
81
4
Service Module (SM)
85
6
Command/Service Module Systems
85
2
Spacecraft Lunar Module Adapter (SLA)
87
1
Significant Configuration Changes from Block I Spacecraft
87
1
Human System Provisions
88
1
AS-205 Space Suits Major Changes Subsequent to AS-204 Fire
88
1
Flight Apparel and Related Equipment
88
2
Bio-Instrumentation System
90
1
Medical Activities
91
1
Medical Kit
91
1
Crew Personal Hygiene
91
1
Body Cleanliness
91
1
Waste Management
91
1
Crew Meals
91
1
Oxygen Masks
92
1
Post Landing Ventilation Ducts
92
1
Survival Equipment
92
1
Launch Complex
92
2
Mission Support
94
3
Launch Control Center
94
1
Mission Control Center
94
1
Communications, Command & Telemetry System
95
1
Real-Time Computer Complex (RTCC)
95
1
Voice Communication System
96
1
Display Control System
96
1
Mission Operations Control Room
96
1
Staff Support Rooms (SSR)
97
1
Recovery Control Room
97
1
Manned Space Flight Network (MSFN)
97
2
MSFN Interfaces
97
2
Recovery Operations
99
2
Apollo 7 Recovery
101
1
Launch Site Area
101
1
Launch Abort Areas
101
1
Primary Landing Area
101
1
Secondary Landing Area
101
1
Contingency Landing Area
101
1
Flight Crew
101
10
General
101
6
Flight Crew Assignments
107
1
Prime Crew Biographical Data
108
2
Backup Crew Biographical Data
110
1
Mission Management Responsibility
111
1
Program Management
112
1
List of Abbreviations
112
3
Post Launch Mission Operation Report
General
115
1
Primary Objectives
116
1
Results of Apollo 7 Mission
116
1
Countdown
116
1
Flight Summary
116
2
Launch Vehicle
118
1
1st Stage
118
1
2nd Stage
118
1
Instrument Unit & Other Systems
118
1
Spacecraft
118
1
Structures
118
1
Propulsion
118
2
Electrical Power System
120
1
Thermal Control
121
1
Cryogenics
121
1
Communications
121
1
Environmental Control System
121
1
Earth Landing System
122
1
Instrumentation
122
1
Flight Crew
122
1
Crew Provisions
122
1
Crew Performance
123
1
Mission Support
123
1
Flight Control
123
1
Network
123
1
Recovery
123
1
Launch Complex
124
2
Technical Deriefing
PART ONE
Pre-Ingress
126
Countdown
127
Prime Ingress and Status Check
127
SECS Pyro
127
Suit Connections
127
Comm Verification
127
PGA Circuit Check
127
Cabin Closeout
127
EDS
128
The RCS Check
128
G & C Verification
128
Launch Preparation
128
Systems Prep
131
Crew Comfort
131
Crew Station Controls and Displays
131
Distinction of Sounds Countdown to Lift Off
131
Vehicle Sway Prior to Ignition
131
Powered Flight
132
S-IB Ignition
132
Lift-Off
132
L/V Lights
132
Roll Program
132
Pitch Program
132
Roll Complete
132
Rate Change
132
Effect at Mach I Transient
132
Max Q
132
EDS Manual
134
GO/NO-GO for Staging
134
Inboard Cut-Off
134
Outboard Cut-Off
134
S-IB/S-IVB Sep
134
S-IVB Engine Ignition
134
S-IVB Plume
134
Scale Change
135
Distinction of Sounds
135
Trajectory GO/NO-GO
135
LET and BPC Jettison
135
Guidance - Initiate
136
CSM Systems Checkout
136
SXT Calibration Test
138
COAS Calibration
140
S-IVB Ventilation
140
Rendezvous
140
IMU Orientation and Alignment
140
AUTO Maneuver-To-Burn Attitude
140
SPS Burn 1
140
SPS Burn 2
142
TPI Burn (RCS)
142
Thrust Monitor (LOS Control)
143
Post-rendezvous Through Deorbit Burn
145
S-IVB Post-rendezvous Tracking at 80, 160, and 320 NM
145
SCT Star Count Test
145
S005, S006 Photography
147
Reentry
153
CM/SM Separation
153
Reentry Parameters
153
Attitude Control Mode
158
Guidance
161
Visual Sighting and Oscillation
162
Drogue Chute Deployment
165
Main Chute Deployment
166
Communications
167
ECS
167
Landing and Recovery
167
Impact on Touchdown
167
Postlanding Checklist
167
Spacecraft Status
168
Battery Power
170
Electrical Power
171
Fuel Cells
171
PART TWO
Seco I
176
Orbital GO/NO-GO
176
Communications
176
Control and Displays
176
Crew Comfort
176
Orbital Operations
177
Insertion Through COAS Calibration
177
CSM/S-IVB Orbital Operations
177
S-IVB Safing
177
S-IVB Take-Over Demonstration
178
Return to S-IVB Auto Control
178
Separation Transposition and Simulated Docking
178
SLA Photography
178
RCS Phasing
180
CSM Systems Checkout
180
Sextant Calibration Test
180
S-IVB Ventilation
180
Rendezvous
180
Braking
180
Rendezvous Navigation
181
Formation
181
Final Separation Burn
181
S-IVB Activity
182
Post-rendezvous Through Deorbit
182
Sextant Tracking
182
SPS Burn Number 3
182
Slosh Damping Test
182
ECS Radiator Test
182
Midcourse Navigation
183
Cryogenic Stratification Test
184
SPS Burn Number 4
184
SPS Cold Soak
184
SPS Burn Number 5
185
Passive Thermal Control Test
186
Window Photography
186
ECS Secondary Coolant Loop Test
187
SCS Backup Align
187
SPS Burns Numbers 6 and 7
188
SXT Calibration
188
PIPA Bias and EMS Bias Test
188
SPS Propellant Thermal Control
188
Auxiliary Propellant Gauging System
188
SCS Backup Alignment Procedure
189
Launch Vehicle Propellant Pressure Displays
189
Window Deposits
189
Manual Retro Attitude Orientation
189
CSM ARIA Communications
189
CSM Structural Performance
189
Crew Activities
190
Landing and Recovery
190
Impact on Touchdown
190
Postlanding Checklist
192
Communications
194
Spacecraft Status
195
Battery Power
195
Postlanding ECS System
195
Ventilation
195
Internal Temperature
195
Spacecraft Attitude
195
Couch Position
196
Internal Pressure
196
Recovery Operations
196
Grappling Hook Deployment
196
Egress
197
Crew Pickup
198
Systems Operation
198
Guidance and Navigation
198
ISS Modes
198
Optical Subsystems
199
Computer Subsystem
199
Rendezvous Radar Modes and Programs
201
G&N Controls and Displays
202
Procedural Data
203
Stabilization and Control
203
Control
204
Service Propulsion
204
DELTA-V Thrust Switches
204
Engine Thrust Vector Alignment
204
DELTA-V Remaining Counter and Thumbwheel
204
SPS Thrust Direct Arm Switch
204
Direct Ullage Button
204
Thrust On Button
204
SPS PC Indicator
204
Reactor Control
204
SM/RCS
204
CM/RCS
204
Electrical Power
204
Battery Charger Switch
206
DC Monitor or Group
207
AC Monitor or Group
207
AC Inverters
208
Main Bus Tie Switches
208
NON ESS Bus Switch
208
G&N Power System
209
Cryogenic System
209
Environmental Control
213
Oxygen Subsystem
213
Water Supply System
217
Water-Glycol System
219
Suit Circuit
221
Gauging System
223
Waste Management System
223
Dew-Point Hygrometer
226
Telecommunications
226
Monitoring
226
Audio Center Controls
227
VHF
228
S-band
229
Power Switches
230
Telemetry Switches
230
Flight Quality Recorder
230
Voice Record Indicator
230
PTT Switches
230
VOX Circuitry
230
The USB Emergency Keying
230
ISE Storage
230
Miscellaneous Systems and GFE
231
Cabin Lighting System and Controls
231
Clocks
232
Event Timers and Controls
233
Accelerometer Indicator
233
Electrical Cables and Adapters
233
Crew Compartment Configuration
235
Mirrors
236
COAS
237
Clothing
239
PGA Connecting Equipment
243
Crew Couches
244
Restraints
244
Flight Data Files
246
Inflight Tool Set and Workshelf
247
Food
247
Personal Hygiene Equipment
249
Visual Sightings in Orbit
251
Experiments
251
Synoptic Weather Photography
252
Lower Body Negative Pressure
252
Premission Planning
253
Mission Rules
253
Mission Control
255
Go/No-Go's
256
PTP and ATP Updates
256
Consumables
256
Flight Plan Changes
257
Real Time Scheduling
259
Training
259
CMS
259
The DCPS
260
CMPS
260
North American Evaluator
261
Egress Training
261
Planetarium
262
MIT
262
Systems Briefing
263
Experiments
265
Spacecraft Systems test
265
Launch Simulations
266
Reentry Simulations
266
Sim Net Sim
266
Mockups
267
Sextant training equipment
267
Planning of Training
267