search for books and compare prices
Tables of Contents for Apollo 7
Chapter/Section Title
Page #
Page Count
Apollo 7 Press Kit Index
First Manned Apollo
10
1
Mission Objectives
11
1
Mission Description
12
6
Flight Plan
18
1
Alternate Missions
19
3
Experiments
22
1
Abort Modes
22
1
Spacecraft Structure Systems
23
7
The Saturn IB Launch Vehicle
30
2
Flight Sequence
32
1
Launch Preparations
33
2
Launch Complex 34
35
2
Mission Control Center Houston
37
1
Manned Space Flight Network
38
4
Photographic Equipment
42
8
Crew Biographies
50
3
Apollo 7 Test Program
53
3
Apollo Contractors
56
1
Apollo Program Officials
57
58
Pre Launch Mission Operation Report
General
61
3
Program Development
61
1
The Apollo 7 Mission
62
2
NASA Mission Objectives for Apollo 7
64
1
Primary Objectives
64
2
Detailed Test Objectives
64
1
Launch Vehicle
64
1
Spacecraft
64
2
Secondary Objectives
66
1
Launch Vehicle
66
1
Spacecraft
66
1
Safety Planning
66
1
General
66
1
Pre-Launch Procedures
67
1
Range Safety
67
1
Launch Countdown and Turnaround Capability AS-205
67
1
Scrub Turnaround
67
1
Turnaround Conditions vs Time
67
1
Post LV Cryo Load (SC Cryo Reservicing)
67
1
Post LV Cryo Load (No SC Cryo Reservicing)
67
1
Pre LV Cryo Load (SC Cryo Reservicing)
68
1
Pre LV Cryo Load (No SC Reservicing)
68
1
Detailed Flight Mission Description
68
1
Nominal Mission
68
3
Pre-Launch
68
1
Launch and Parking Orbit
68
1
S-IVB/CSM Separation
69
1
CSM/S-IVB Rendezvous
69
1
Terminal Phase Initiation
70
1
CSM Operations
70
1
De-Orbit Maneuver
71
1
Re-Entry and Landing
71
1
Contingency Operations
71
6
Aborts
72
4
Alternate Missions
76
1
Space Vehicle Description
77
1
Launch Vehicle Description
78
2
First Stage (S-IB)
78
1
Second Stage (S-IVB)
78
1
Instrument Unit (IU)
79
1
Spacecraft Description
80
1
Safety Considerations
80
1
Launch Escape Assembly
80
1
Command Module (CM)
81
4
Service Module (SM)
85
6
Command/Service Module Systems
85
2
Spacecraft Lunar Module Adapter (SLA)
87
1
Significant Configuration Changes from Block I Spacecraft
87
1
Human System Provisions
88
1
AS-205 Space Suits Major Changes Subsequent to AS-204 Fire
88
1
Flight Apparel and Related Equipment
88
2
Bio-Instrumentation System
90
1
Medical Activities
91
1
Medical Kit
91
1
Crew Personal Hygiene
91
1
Body Cleanliness
91
1
Waste Management
91
1
Crew Meals
91
1
Oxygen Masks
92
1
Post Landing Ventilation Ducts
92
1
Survival Equipment
92
1
Launch Complex
92
2
Mission Support
94
3
Launch Control Center
94
1
Mission Control Center
94
1
Communications, Command & Telemetry System
95
1
Real-Time Computer Complex (RTCC)
95
1
Voice Communication System
96
1
Display Control System
96
1
Mission Operations Control Room
96
1
Staff Support Rooms (SSR)
97
1
Recovery Control Room
97
1
Manned Space Flight Network (MSFN)
97
2
MSFN Interfaces
97
2
Recovery Operations
99
2
Apollo 7 Recovery
101
1
Launch Site Area
101
1
Launch Abort Areas
101
1
Primary Landing Area
101
1
Secondary Landing Area
101
1
Contingency Landing Area
101
1
Flight Crew
101
10
General
101
6
Flight Crew Assignments
107
1
Prime Crew Biographical Data
108
2
Backup Crew Biographical Data
110
1
Mission Management Responsibility
111
1
Program Management
112
1
List of Abbreviations
112
3
Post Launch Mission Operation Report
General
115
1
Primary Objectives
116
1
Results of Apollo 7 Mission
116
1
Countdown
116
1
Flight Summary
116
2
Launch Vehicle
118
1
1st Stage
118
1
2nd Stage
118
1
Instrument Unit & Other Systems
118
1
Spacecraft
118
1
Structures
118
1
Propulsion
118
2
Electrical Power System
120
1
Thermal Control
121
1
Cryogenics
121
1
Communications
121
1
Environmental Control System
121
1
Earth Landing System
122
1
Instrumentation
122
1
Flight Crew
122
1
Crew Provisions
122
1
Crew Performance
123
1
Mission Support
123
1
Flight Control
123
1
Network
123
1
Recovery
123
1
Launch Complex
124
2
Technical Deriefing
PART ONE
Pre-Ingress
126
 
Countdown
127
 
Prime Ingress and Status Check
127
 
SECS Pyro
127
 
Suit Connections
127
 
Comm Verification
127
 
PGA Circuit Check
127
 
Cabin Closeout
127
 
EDS
128
 
The RCS Check
128
 
G & C Verification
128
 
Launch Preparation
128
 
Systems Prep
131
 
Crew Comfort
131
 
Crew Station Controls and Displays
131
 
Distinction of Sounds Countdown to Lift Off
131
 
Vehicle Sway Prior to Ignition
131
 
Powered Flight
132
 
S-IB Ignition
132
 
Lift-Off
132
 
L/V Lights
132
 
Roll Program
132
 
Pitch Program
132
 
Roll Complete
132
 
Rate Change
132
 
Effect at Mach I Transient
132
 
Max Q
132
 
EDS Manual
134
 
GO/NO-GO for Staging
134
 
Inboard Cut-Off
134
 
Outboard Cut-Off
134
 
S-IB/S-IVB Sep
134
 
S-IVB Engine Ignition
134
 
S-IVB Plume
134
 
Scale Change
135
 
Distinction of Sounds
135
 
Trajectory GO/NO-GO
135
 
LET and BPC Jettison
135
 
Guidance - Initiate
136
 
CSM Systems Checkout
136
 
SXT Calibration Test
138
 
COAS Calibration
140
 
S-IVB Ventilation
140
 
Rendezvous
140
 
IMU Orientation and Alignment
140
 
AUTO Maneuver-To-Burn Attitude
140
 
SPS Burn 1
140
 
SPS Burn 2
142
 
TPI Burn (RCS)
142
 
Thrust Monitor (LOS Control)
143
 
Post-rendezvous Through Deorbit Burn
145
 
S-IVB Post-rendezvous Tracking at 80, 160, and 320 NM
145
 
SCT Star Count Test
145
 
S005, S006 Photography
147
 
Reentry
153
 
CM/SM Separation
153
 
Reentry Parameters
153
 
Attitude Control Mode
158
 
Guidance
161
 
Visual Sighting and Oscillation
162
 
Drogue Chute Deployment
165
 
Main Chute Deployment
166
 
Communications
167
 
ECS
167
 
Landing and Recovery
167
 
Impact on Touchdown
167
 
Postlanding Checklist
167
 
Spacecraft Status
168
 
Battery Power
170
 
Electrical Power
171
 
Fuel Cells
171
 
PART TWO
Seco I
176
 
Orbital GO/NO-GO
176
 
Communications
176
 
Control and Displays
176
 
Crew Comfort
176
 
Orbital Operations
177
 
Insertion Through COAS Calibration
177
 
CSM/S-IVB Orbital Operations
177
 
S-IVB Safing
177
 
S-IVB Take-Over Demonstration
178
 
Return to S-IVB Auto Control
178
 
Separation Transposition and Simulated Docking
178
 
SLA Photography
178
 
RCS Phasing
180
 
CSM Systems Checkout
180
 
Sextant Calibration Test
180
 
S-IVB Ventilation
180
 
Rendezvous
180
 
Braking
180
 
Rendezvous Navigation
181
 
Formation
181
 
Final Separation Burn
181
 
S-IVB Activity
182
 
Post-rendezvous Through Deorbit
182
 
Sextant Tracking
182
 
SPS Burn Number 3
182
 
Slosh Damping Test
182
 
ECS Radiator Test
182
 
Midcourse Navigation
183
 
Cryogenic Stratification Test
184
 
SPS Burn Number 4
184
 
SPS Cold Soak
184
 
SPS Burn Number 5
185
 
Passive Thermal Control Test
186
 
Window Photography
186
 
ECS Secondary Coolant Loop Test
187
 
SCS Backup Align
187
 
SPS Burns Numbers 6 and 7
188
 
SXT Calibration
188
 
PIPA Bias and EMS Bias Test
188
 
SPS Propellant Thermal Control
188
 
Auxiliary Propellant Gauging System
188
 
SCS Backup Alignment Procedure
189
 
Launch Vehicle Propellant Pressure Displays
189
 
Window Deposits
189
 
Manual Retro Attitude Orientation
189
 
CSM ARIA Communications
189
 
CSM Structural Performance
189
 
Crew Activities
190
 
Landing and Recovery
190
 
Impact on Touchdown
190
 
Postlanding Checklist
192
 
Communications
194
 
Spacecraft Status
195
 
Battery Power
195
 
Postlanding ECS System
195
 
Ventilation
195
 
Internal Temperature
195
 
Spacecraft Attitude
195
 
Couch Position
196
 
Internal Pressure
196
 
Recovery Operations
196
 
Grappling Hook Deployment
196
 
Egress
197
 
Crew Pickup
198
 
Systems Operation
198
 
Guidance and Navigation
198
 
ISS Modes
198
 
Optical Subsystems
199
 
Computer Subsystem
199
 
Rendezvous Radar Modes and Programs
201
 
G&N Controls and Displays
202
 
Procedural Data
203
 
Stabilization and Control
203
 
Control
204
 
Service Propulsion
204
 
DELTA-V Thrust Switches
204
 
Engine Thrust Vector Alignment
204
 
DELTA-V Remaining Counter and Thumbwheel
204
 
SPS Thrust Direct Arm Switch
204
 
Direct Ullage Button
204
 
Thrust On Button
204
 
SPS PC Indicator
204
 
Reactor Control
204
 
SM/RCS
204
 
CM/RCS
204
 
Electrical Power
204
 
Battery Charger Switch
206
 
DC Monitor or Group
207
 
AC Monitor or Group
207
 
AC Inverters
208
 
Main Bus Tie Switches
208
 
NON ESS Bus Switch
208
 
G&N Power System
209
 
Cryogenic System
209
 
Environmental Control
213
 
Oxygen Subsystem
213
 
Water Supply System
217
 
Water-Glycol System
219
 
Suit Circuit
221
 
Gauging System
223
 
Waste Management System
223
 
Dew-Point Hygrometer
226
 
Telecommunications
226
 
Monitoring
226
 
Audio Center Controls
227
 
VHF
228
 
S-band
229
 
Power Switches
230
 
Telemetry Switches
230
 
Flight Quality Recorder
230
 
Voice Record Indicator
230
 
PTT Switches
230
 
VOX Circuitry
230
 
The USB Emergency Keying
230
 
ISE Storage
230
 
Miscellaneous Systems and GFE
231
 
Cabin Lighting System and Controls
231
 
Clocks
232
 
Event Timers and Controls
233
 
Accelerometer Indicator
233
 
Electrical Cables and Adapters
233
 
Crew Compartment Configuration
235
 
Mirrors
236
 
COAS
237
 
Clothing
239
 
PGA Connecting Equipment
243
 
Crew Couches
244
 
Restraints
244
 
Flight Data Files
246
 
Inflight Tool Set and Workshelf
247
 
Food
247
 
Personal Hygiene Equipment
249
 
Visual Sightings in Orbit
251
 
Experiments
251
 
Synoptic Weather Photography
252
 
Lower Body Negative Pressure
252
 
Premission Planning
253
 
Mission Rules
253
 
Mission Control
255
 
Go/No-Go's
256
 
PTP and ATP Updates
256
 
Consumables
256
 
Flight Plan Changes
257
 
Real Time Scheduling
259
 
Training
259
 
CMS
259
 
The DCPS
260
 
CMPS
260
 
North American Evaluator
261
 
Egress Training
261
 
Planetarium
262
 
MIT
262
 
Systems Briefing
263
 
Experiments
265
 
Spacecraft Systems test
265
 
Launch Simulations
266
 
Reentry Simulations
266
 
Sim Net Sim
266
 
Mockups
267
 
Sextant training equipment
267
 
Planning of Training
267